Workgroup Number | WG10 |
Workgroup Name | Operation And Maintenance Work Group |
Workgroup Charter | Work Group 10 has full responsibility for the O1 interface OAM specifications for O-RAN, including unified O1 interface operation and notification, and for creating a detailed OAM architecture and requirements consistent with the overall OAM architecture described in the WG1 O-RAN Architecture document. This includes a set of information models/data models for O-RAN. |
Workgroup Scope | Develop O-RAN O1 OAM Information and data models, using industry developed baselines where available, and adding further material as needed by O-RAN’s architecture and interfaces Develop O1 interface specifications to O-RAN elements consistent with the principles outlined in O-RAN whitepaper and elaborated in Architecture Description Document. Develop a detailed OAM architecture consistent with the Architecture Description Document, including key management interfaces and deployment options: Develop the role of the O1 interface in Control and Management loops of O-RAN architecture, in conjunction with other Work Groups Provide coordinated definition and collection of O1 KPIs and PM, FM across all WGs
|
Workgroup Co-chairs | AT&T (ATT): David Kinsey China Mobile (CMCC): Xiang Li NOKIA (NOK): Anatoly Andrianov |